2 STACK MULTI-JUNGLE (SM20)
UNPACKING AND ASSEMBLY INSTRUCTIONS
M051-K50-A123
1
SM20 Unpacking & Assembly Instructions
ASSEMBLY
Figure 1 shows an assembled SM20.
Figure 1. SM20 main components (cables removed for clarity).
1. 1 stack cell (2)
2. Connecting beam
1. Place the two weight “cells” in their final resting spots. The cells will be
approximately 11’4” apart as shown in Figure 2.
Figure 2. Set the weight stack cells.
3
SM20 Unpacking & Assembly Instructions
3. Bolt on the connecting beam using a 5/8” socket with extension and combination wrench, to
the cells using the four 7/16” x 6” bolts, 7/16” washers, and 7/16” nuts, end cap washers and
end caps. Figure 3 shows the connected cells. You may wish to use a pinch bar to align the
bolt holes.
Figure 3. Bolt on the connecting beam.
Figure 4. Configuration for 6” bolts.
4
SM20 Unpacking & Assembly Instructions
CROSSOVER CABLE ROUTING
NOTE: THE INFORMATION BELOW IS FOR REFERENCE ONLY. THE
CABLES ON THE SM20 HAVE BEEN INSTALLED AT THE
FACTORY.
Figure 5. Crossover cable routing.
5
SM20 Unpacking & Assembly Instructions
Figure 8. Screw the pulley into the weight stack.
6
SM20 Unpacking & Assembly Instructions
HARDWARE
Hardware Figure 1. Assembly Parts.
The parts shown in Hardware Figure 1 are used to assemble the SM20. They are:
A. 7/16” x 6” hex head bolt (used to bolt connecting beam to the tops of the cells)
B. 7/16” flat washer
C. 7/16” cap washer (use on head end of the 6” bolt so end cap will fit on the nut)
D. 7/16” hex head nut
E. End caps (bolt covers)
Hardware Kit: SK50-S0079-0000
PARTS LIST
Part #
ID
Description
Quantity
Main components
1
2
1-stack cell
Connecting beam
2
1
6” bolt hardware
0017-00101-1561
0017-00104-0363
0017-00104-0366
0017-00103-0233
0017-00042-0969
7/16” x 6” hex head bolt
7/16” flat washer
7/16” cap washer
7/16” Nyloc nut
End caps
4
4
4
4
4
A
B
C
D
E
Handle and bar
hardware
Safety carabiner
Crossover handle
Leg strap
2
2
1
7
|